On 12th of January 2013 after reconstruction was reopened store TEMPO Nové Zámky.
During the 10-day reconstruction, our company replaced all the interior equipment of the store – refrigeration and freezing furniture, shelf system and cash register zone. The cooling engine room was also subject to complete reconstruction.
The main purpose of the reconstruction in addition to the exchange of “old” furniture was to reduce the energy intensity of the operation, to which mainly contributed the new cooling and freezing technology, the cooling circuit control system, modern cooling furniture with high efficiency, but also e. g. store lighting replacement.
You can also find more in photos in the photo gallery here.